Project
Rivermount College
Riparian Restoration and Revegetation Project
Project Overview
Regen has been engaged by Rivermount College to undertake restoration works along the adjourning Albert River riparian zone since 2017. This has included the installation of 7270 native plants and recently the creation of natural wetland. Engagement with the school and its students has been integral to the project, with the students assisting with the plantings whenever possible. Ongoing weed control and planting maintenance continue to enhance the ecological value of the area by turning previously turfed areas into native ecosystems.
Project Objectives
• School engagement
• Ecological Restoration Techniques
• Revegetation Planting
• Native Plant supply
• Weed control
Our wonderful results
• Student participation in restoration works
• 9 years restoring and maintaining critical riparian zones
• 27,900m2 of riparian ecosystem and 11,700m2 wetland ecosystem restored and maintained





